In 2003, construction began on a number of new buildings across the campus. These buildings were to change the entire look and feel of the college. The new construction was expected to be completed in phases, shown on these different maps. Working with faculty and staff in Building User Groups (BUGs) was tBP/Architecture, responsible for the master planning design for most major projects and remodels. Flewelling & Moody were responsible for the construction documents, with project construction facilitated by the construction management firm of C. W. Driver, and program management by the firm of FLCM. To accommodate the new construction, 8,000 feet of storm drains, sewer pipe, and water lines needed to be added as well.