Fullerton College: A Pictorial History

The first building to be completed with Measure X money was the Campus Safety Building, which opened December 9, 2004. The 2,000-square foot building was located in what had been staff parking lot C. Prior to the move, security personnel were crammed into a small trailer located to the left of the 700 Building. The new facility included shower and locker facilities for officers and a training room that doubled as an emergency operations center in the event of a power outage. In an effort to bolster security, the campus added more security cameras, which were then monitored by Campus Safety staff.