After the Library & Learning Resources Center opened, the new building was not without its problems. During 2007-2008, staff and students were startled by a mysterious crash that went unexplained for several days until another loud crash resounded throughout the library. Staff then discovered that the library dome tiles were sliding off in sections and falling on the roof. After a lengthy delay, a new dome was installed on the top of the building on April 25, 2009. The cost of the new dome was covered by a $100,000 insurance policy. The replacement dome was made of fiberglass substrate with a steel frame which took six weeks to construct.