Fullerton College: A Pictorial History

The Technology & Engineering complex officially opened on August 29, 2013 after nearly two years of construction and renovation. The 700 and 900 buildings includes 36 multi-disciplinary class labs, 16 general assignment classrooms, and 19 individual and jointly assigned offices. The complex with its 76,425 square feet of assignable space was designed by R2A Architecture, with C.W. Driver performing the construction management responsibilities. (Photo courtesy of Jane Ishibashi.)
Tags: 700, 900, buildings